Name: Brian Thacker Date: 01-19-2016Job #:
Address: 6852 E. Tawa St.City: TucsonState: AZZip: 85715
Phone: 520-243-3784Phone:Email: bet.pim@gmail.com

We propose to furnish all materials and perform all labor necessary to complete the following:

Demolition & Installation

Installation Labor & Materials

Special Services

Equipment

SEER/AFUEModel #Bid PriceLess IncentiveTotal Price
Option 1) Lennox 20.00 SEERLennox XC25-060 5 ton system with communicating Furnace and Thermostat. This is a variable capacity system using the I-Comfort thermostat. Qualifies for TEP credit of $650.00 and a Russett credit of $400.00. A mail back rebate of $1000.00 also applies and is a separate rebate after the installation.$11829.76$1050.00$10779.76 See Check or Cash payment Option under payment terms. Net cost after Lennox mail back rebate $9779.76
Option 2) Lennox 19.50 SEERLennox XP25-060 5 ton Heat Pump option with communicating thermostat for variable capacity operation as in option 1. Includes new electrical circuit to mechanical room. Qualifies for TEP credit of $650.00 and a Russett credit of $400.00. A Lennox mail back rebate of $1000.00 also applies valid through February 12th, 2016 as in option 1.$12898.97$1050.00$$11848.97 see payment options below. Net cost after mail back rebate $10848.97

Warranty

 

Notes

The code required Manual J-8 whole house heating and cooling calculation is performed.
The Manual S equipment sizing calculation is performed to ensure proper sizing.
Provide sealing of supply air register boxes at sheetrock to reduce duct leakage as part of the TEP quality installation program.

Your existing system could qualify for an additional TEP credit of $350.00 when tested through the check me program.
To have your system tested for the possible additional credit, cal Tim Sibley at 520-490-1504 and he will schedule the testing. There is no cost to you for the testing.






Terms & Descriptions

Service charge of 1.5% per month will be charged on the unpaid balance above.

Payment Terms

5% discount for check or cash full payment. Discount does not apply to credit card payments due to the fees.
Balance due upon completion.

Cash or Check option pricing is a follows:

Option 1) $10240.77 Net cost after Lennox mail back rebate of $1000.00 = $9240.77

Option 2) $11256.52 Net cost after Lennox mail back rebate of $1000.00 = $10256.52

Note: due to the construction type of your home, we recommend the gas heat system over the heat pump system. With Adobe wall construction, gas heat is the better performer.














Submitted By: Carl Craig

Acceptance

You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above proposal, for which the undersigned agrees to pay the amount mentioned in said proposal, and according to the terms thereof. The material delivered or installed under this order shall not be deemed a fixture, but shall remain the property of and subject to the removal by Russett Southwest Corporation, until the agreed terms are complied with.

Accepted by:
Date:
credentials